Sunday 10 November 2013

Governor Adams Oshiomhole of Edo State Has Commissioned Four Roads That Was Completed By His Administration

Oshiomhole-commissioning-roads-in-Benin

Governor Adams Oshiomhole of Edo State has commissioned four roads completed by his administration in the first year of his second term, as part of activities to celebrate his fifth anniversary as Governor of the state. Speaking at the different commissioning points which included the Ogba Market Road, Ogiesoba Road, Osuan Road (Vegetable Market Road), Golf Course Road, now renamed Tom Ikimi Lane, Oshiomhole said his government will continue to do more even in the face of dwindling resources.


The Governor said “during my campaign, I said we would deal with the flooding problem on a holistic basis. We would carry out studies on the basis of fact and studies; we will construct and build roads. “I am happy that today we are celebrating and this was done within the first year of my second term. I need to emphasise this that this was done in the first year of my second term because for us there was never a break. Around this time last year, our engineers were working and doing some excavation and now these roads have been completed.

“These roads are part of sixteen other roads which we loosely refer to as Airport roads but it includes several roads and several drainages. So for those who do not know, we have built a number of roads in our second term. “Let me assure you that the only way to ensure that the Edo project continues is to listen to words of wisdom. Everybody in the APC family, we all understood that our defence line is with the people.

“Let me assure the people of the state that we must continue to do even more even in the face of dwindling resources in order to strengthen the partnership the great people of this state and this government and indeed future government to be formed by APC long after my departure from government.

No comments:

Post a Comment